Mitsubishi Mirage Galant Diamant 1990-2000 Factory Service Repair Manual
Normaler Preis
$133.00
Verkaufspreis
$133.00
Normaler Preis
Grundpreis
/ pro
Verkauf
Ausverkauft
Mitsubishi Mirage, Galant, Diamant 1990-2000 Factory Service & Shop Manual Complete workshop & service manual with electrical wiring diagrams for Mitsubishi Mirage, Galant, Diamant 1990-2000. Its the same service manual...
Mitsubishi Mirage, Galant, Diamant 1990-2000 Factory Service & Shop Manual
Complete workshop & service manual with electrical wiring diagrams for Mitsubishi Mirage, Galant, Diamant 1990-2000. Its the same service manual used by dealers that guaranteed to be fully functional and intact without any missing page.
This Mitsubishi Mirage, Galant, Diamant 1990-2000 service & repair manual (including maintenance, overhaul, disassembling & assembling, adjustment, tune-up, operation, inspecting, diagnostic & troubleshooting) is divided into different sections. Each section covers a specific component or system with detailed illustrations. A table of contents is placed at the beginning of each section. Pages are easily found by category, and each page is expandable for great detail. The printer-ready PDF documents work like a charm on all kinds of devices.
EXCERPT:
1994-00 Galant and 1997-00 Diamante
1, Raise and safely support the vehicle securely on jack-stands.
2. Remove the wheel and tire assembly.
3. Support the rear axle using a jack or other suitable device.
4. Remove the trailing arm-to-knuckle connection.
5. Remove the trailing arm-to-body mounting through-bolt and remove the trailing arm.
To install:
6. Install the trailing arm and install the trailing arm-to-body mounting through-bolt. Tighten the bolt to 99-114 ft. lbs. (137-157 Nm).
7. Install the trailing arm-to-knuckle connection.
Tighten the bolt to 85-99 ft. Ibs. (118-137 Nm).
8. Remove the axle support device.
9. install the wheel and tire assembly.
10. Lower the vehicle.
1992-96 Diamante
1. Raise and safely support the vehicle securely on jack-stands.
2. Remove the wheel and tire assembly.
3. Remove the brake rotor.
4. Remove the hub and bearing assembly.
5. Support the rear axle using a jack or other suitable device.
6. Remove the lower shock absorber-to-trailing arm connection.
7. Remove the stabilizer bar link-to-trailing arm connection.
8. Remove the tie rod end-to-trailing arm connection.
9. Remove the lower control arm-to-trailing arm connection.
10. Remove the trailing arm-to-body mounting through-bolt and remove the trailing arm.
To install:
11. Install the trailing arm and install the trailing arm-to-body mounting through-bolt. Tighten the bolt to O1-116ft. lbs. (14C-160 Nm).
12. Install the trailing arm-to-lower control arm connection. Tighten the bolt to 101-116 ft. lbs. (140-l 60 Nm).
13. Install the tie rod end-to-trailing arm connection.
Tighten the nut to 21 ft. lbs. (29 Nm).
14. Install the stabilizer bar link-to-trailing arm connection. Tighten the nut to 29 ft. lbs. (40 in).
15. Install the lower shock absorber-to-trailing arm connection. Tighten the bolt to 65 ft. lbs. (90 Nm).
16. Remove the axle support device.
17. Install the hub and bearing assembly.
18. Install the brake rotor.
19. Install the wheel and tire assembly.
20. Lower the vehicle.
2015 GROUP INDEX - MITSUBISHI MIRAGE SERVICE MANUAL
General
Engine
Engine Lubrication
Fuel
Engine Cooling.
Intake & Exhaust
Engine Electrical
Engine & Emission Control
Clutch
Automatic Transmission
Front Axle
Rear Axle.
Wheel & Tire
Service Brakes
Parking Brake
Steering
Body
Exterior
Interior & Supplemental Restraint (SRS)
Chassis Electrical.
Heater, Air Conditioning & Ventilation
Component Locations.
Configuration Diagrams & Splice Locations.
Circuit Diagrams
Body Repair Manual
Power Plant Mount
Front Suspension
Rear Suspension
Alphabetical Index
Manual Transmission
ON-VEHICLE SERVICE
PARKING BRAKE LEVER STROKE CHECK AND ADJUSTMENT
STROKE CHECK
Attach the spring balance to the center of the parking brake lever grip. Then, check that the stroke is within the standard value when the parking brake lever is pulled to the vertical direction of the lever with a force of approximately 200 N (45.0 lb).
Standard value: 7 - 9 notches
Wenn du dich für eine Auswahl entscheidest, wird die Seite komplett aktualisiert.